| Client | : Beyobası Energy Generation Inc. Co(by AKFEN Inc.) |
| Province | : Mersin |
| Location | : Anamur |
| Survey | : 1/25 000 – 1/1000 Scale |
| Project’s Goal | : Energy |
Otluca HPP Final Report and Construction Prj. (MERSİN)
Preparation of Final Projects
Preparation of Implementation Projects
| OTLUCA I HEPP | |
| Project Discharge | : 20.00 m3/s |
| Number of Units | : 3 units |
| Installed Power | : 35.62 MW |
| Gross Head | : 213.36 m |
| OTLUCA II HEPP | |
| Project Discharge | : 24.00 m3/h |
| Number of Units | : 3 units |
| Installed Power | : 35.62 MW |
| Gross Head | : 39.41 m |
| BOĞUNTU HEPP | |
| Project Discharge | : 15.00 m3/s |
| Number of Units | : 3 units |
| Installed Power | : 3.36 MW |
| Gross Head | : 69.70 m |










