Aralık HPP Final Report and Construction Projects (ARTVİN)

Client : MNG Electric Generation Inc. Co.
Province : Artvin
Location : Borçka
Survey : 1/25 000 – 1/1000 Scale
Project’s Goal : Energy

Preparing the Preliminary Review Report
Preparation of Feasibility Report
Preparation of Final Projects
Preparation of Implementation Projects

Project Discharge : 5.00 m3/s
Number of Units : 2 units
Installed Power : 12.41 MW
Gross Head : 300.7 m
Total Energy : 45.54 GWh/Year
Weir Height : 4.5 m
Crest Length : 15.00 m
Transmission Channel Type : Rectangular Channel
Transmission Channel Length : 90.50 m
Penstock Diameter : 1.20 m
Penstock Length : 530.00 m