| Client | : MNG Electric Generation Inc. Co. |
| Province | : Artvin |
| Location | : Borçka |
| Survey | : 1/25 000 – 1/1000 Scale |
| Project’s Goal | : Energy |
Aralık HPP Final Report and Construction Projects (ARTVİN)
Preparing the Preliminary Review Report
Preparation of Feasibility Report
Preparation of Final Projects
Preparation of Implementation Projects
| Project Discharge | : 5.00 m3/s |
| Number of Units | : 2 units |
| Installed Power | : 12.41 MW |
| Gross Head | : 300.7 m |
| Total Energy | : 45.54 GWh/Year |
| Weir Height | : 4.5 m |
| Crest Length | : 15.00 m |
| Transmission Channel Type | : Rectangular Channel |
| Transmission Channel Length | : 90.50 m |
| Penstock Diameter | : 1.20 m |
| Penstock Length | : 530.00 m |