| Client | : TÜM Energy and Trade Inc. Co.(by AGE Construction Inc. Co.) |
| Province | : Adıyaman |
| Location | : Tut |
| Survey | : 1/25 000 – 1/1000 Scale |
| Project’s Goal | : Energy |
Pınar HPP Final Report and Construction Projects (ADIYAMAN)
Preparing the Preliminary Review Report
Preparation of Feasibility Report
Preparation of Final Projects
Preparation of Implementation Projects
| Project Discharge | : 50.00 m³/s |
| Number of Units | : 3 units |
| Installed Power | : 30.10 MW |
| Gross Head | : 70.84 m |
| Total Energy | : 137.60 GWh/Year |
| Weir Height | : 7.00 m |
| Crest Length | : 75.00 m |
| Transmission Channel Type | : Trapezoidal Channel |
| Transmission Channel Lengt | : 12 120.00 m |
| Penstock Diameter | : 3.60 m |
| Penstock Length | : 105.00 m |