Client | : TÜM Energy and Trade Inc. Co.(by AGE Construction Inc. Co.) |
Province | : Adıyaman |
Location | : Tut |
Survey | : 1/25 000 – 1/1000 Scale |
Project’s Goal | : Energy |
Pınar HPP Final Report and Construction Projects (ADIYAMAN)
Preparing the Preliminary Review Report
Preparation of Feasibility Report
Preparation of Final Projects
Preparation of Implementation Projects
Project Discharge | : 50.00 m³/s |
Number of Units | : 3 units |
Installed Power | : 30.10 MW |
Gross Head | : 70.84 m |
Total Energy | : 137.60 GWh/Year |
Weir Height | : 7.00 m |
Crest Length | : 75.00 m |
Transmission Channel Type | : Trapezoidal Channel |
Transmission Channel Lengt | : 12 120.00 m |
Penstock Diameter | : 3.60 m |
Penstock Length | : 105.00 m |