Client | : FETAŞ – Fethiye Energy and Trade Inc. Co. |
Province | : Trabzon |
Location | : Of – Maki River |
Survey | : 1/25 000 – 1/1000 Scale |
Project’s Goal | : Energy |
Sarmaşık I Weir and HPP Final Report and Construction Projects (TRABZON)
Preparing the Preliminary Review Report
Preparation of Feasibility Report
Preparation of Final Projects
Preparation of Implementation Projects
Project Discharge | : 5.00 m3/s |
Number of Units | : 2 units |
Installed Power | : 20.58 MW |
Gross Head | : 490.53 m |
Total Energy | : 95.33 GWh/Year |
Weir Height | : 3.00 m |
Crest Length | : 15.00 m |
Transmission Tunnel Type | : Adjusted Horseshoe |
Transmission Channel Length | : 460.00 m |
Penstock Diameter | : 1.30 m |
Penstock Length | : 494.00 m |